6/4/09 – Locked up and Muddy

The rain finally came. The house is now closed up – all the doors and windows are on and the place is locked down. This is good. Now the construction team can start on things like electrical and final trim without worrying about thiefs coming in the night and stealing anything of value.

The gas meter was connected, too. I suspect they passed the pressure test with flying colors.

It was slippery out there on site today. I managed to muddy up my shoes real good.


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.