After that rain delay, I was sure things would be stalled for a bit. Boy, was I wrong! Up went the vapor barrier and first floor post and beam in 1 day! It’s unbelievable how fast these guys work. The first floor air ducts, waste lines and water lines went in.
Rumor is that sewer will be connected shortly. The lateral is under the sidewalk (or where the sidewalk was).