5/21/09 – All Trussed Up

The trusses are in. Check out the vault in the master bedroom!

The remaining framing on the upstairs is done now. There are a few adjustments to be made to the upstairs framing. Notably, the master closet will grow a little thanks to the 90% efficient furnace that’s being installed. It doesn’t require a flue to run vertically, so the mechanical chase can shrink quite a bit.

Our contractor says the windows and doors go in soon so they can start working on plumbing, wiring and other items that are a little more costly and likely to be stolen off of an unsecured site.